Company's name: | SAE Magnetics n and end date: 2007-02- |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | Product Engineer I (Sir Eng.) |
Job description: | ⒈ Manage assigned new projects(Samsung 3.5”Storm 2ch)HSA Assy from development start to launch on. ⒉ Supervise a mechanical engineering team to monitor progress of products built on assembly line, Support technical issues follow-up and problem solving,perform FA. ⒊ Apply experience in manufacturing techniques for process improvements, Report production data, monitor line stoppage and corrective actions for line restart. |
Reasons for leaving: | |
|
Company's name: | Lafe GroupsBegin and end date: 2006-09-2007-01 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | FA Engineer |
Job description: | ⒈ Lead failure analysis within the team and determine the solutions ⒉ Coach the FA team in methodology ⒊ Validate the closed FA |
Reasons for leaving: | |
|
Company's name: | Lafe GroupsBegin and end date: 2004-02-2006-08 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | Development Engineer |
Job description: | ⒈ 2004-02 ~ 2005-04,Attend Pilot builds for EVT, DVT and PVT for Tape Head TS400 Project Actuator process, achieve schedule, cost, performance and quality targets. 2. 2005-05 ~ 2006-06,As a Team Leader,reponsible for TS400 Project Bridge structure design and process development,start to mass production ahead of schedule about 4 Months;and develop Auto Roller Alignment Machine,increase process Yield about 22% and Lead time improve to 5 min from 22 min. ⒊ 2006-07 ~ 2006-08, As a menber of TS800 Project Head Contour structure design,simulate and optimize Head Contour sructure by TapeLap1,read and write performance exceed the customer's targets,and develop Head Contour Evaluation Procedure. |
Reasons for leaving: | |